Demolition Day Four - June 29, 2013



Side paneling removal opposite the entry | Boards here are completely rotted out from hole in roof
Side paneling completely removed | Electrical box connection hanging |  I am having custom electrical run once I get a floor plan layout together

Paneling @ door completely removed | Propane hose connection removed | The daylight shining through the metal are holes and a rotted connection at the floor, all of which will be plugged
Kitchen wall paneling completely removed


View from where the future kitchen cabinets will be located
Now that the paneling is all ripped out, onto the floor