See what I mean...
Any who, today was floor install day.
The day began circa 8:00 am with jamming a car full of tools. From there...
First order of the day, frame got a good grinding. |
Then a bath of Rustoleum primer, finished with Rustoleum black. |
Front corner frames installed and fastened to existing 'C' channel frame with 1/4" x 4" SDS screws. |
1-1/2" SQ. steel tubing (red) was bolted inside the existing 'C' channel frame to catch the back portion of the floor frame. |
'L' brackets were used to keep everything in order at the rear of the trailer. Once everything was in place, the frame was BOMBER. |
As the darkness fell, It fit. Whew! |
Back of trailer will house bench seating | with storage below | a beer drinking table | that will transform into the bed | with lighting & storage above. Design TBD. |
Next on the list...wheel wells. Stay tuned... |
Finish circa 7:00 pm
With old man winter on his way, things might slow down a bit here, but please check in soon for updates.
Cheers!
No comments:
Post a Comment